WBS 121.06

Level 2 Manager: Steven Dixon

email: steveo@fnal.gov

lab phone: +1 630 840-8501

IARC Office: 3rd floor - Suite 380​


 

​​​​W​BS
​​Level 3 Manager
121.06.01 - Project ManagementSteve Dixon
121.06.02 - Site Prepa​​​​​​rationErnesto Alcaraz
121.06.03 - Cryogencis Plant BuildingErnesto Alcaraz
121​.06.04 - Utility Plant BuildingErnesto Alcaraz
121.06.05 - Linac ComplexErnesto Alcaraz
121.06.06 - Booster C​onnection​​
Ernesto Alcaraz​​​

​​​​​Teamcenter: Technical Doc​​​uments

DocDB: Project ​​​Manage​​​ment Documents​

PIP-II Con​​ventional Facilities SharePoint: Documents

A/E Design Docum​​​e​​nts

    • ​​PIP-II Project Design Drawings/Specifications/Basis of Design Documents/​Guiding Principles/QAQC Process Reports
      • 121.06.02 - Site Preparation
        • ​ED0008374 - Site Clearing
        • ED0008549 - Site Preparation
        • ED0009617 - Site Work
        • ED0009625 - Site Restoration​​
      • ​​121.06.03 - Cryogenics Plant Building
        • ​ED0008373 - Cryogenics Plant Building
      • 121.06.04 - Utility Plant
        • ​ED00XXXXX - Utility Plant
      • ​​121.06.05 - Linac Complex​
        • ​ED0011259 - Linac Complex
      • 121.06.06 - Booster Connection
        • ​ED00XXXXX - Booster Connection

Engineering Process Document Management Spreadsheets (EPDMs)
  • ED0002857 - Conventional Facilities
    • ED0008650 - Site Preparation
      • ED0006787 - Functional Requirements Specification (FRS)
      • ED0006789 - Technical Requirements Specification (TRS)​
      • ED0007697 - Interface Control Document (ICD)
      • ED0008276 - Risk Assessment
      • ED00XXXXX - Prevention Through Design Assessments
    • ED0008651 - Cryogenics Plant Building
      • ED0006718 - Functional Requirements Specification (FRS)
      • ED0006719 - Technical Requirements Specification (TRS)
      • ED0008588 - Requirements and Specification Review (RSR)
      • ED0007697 - Interface Control Document (ICD)
      • ED0010288 - Risk Assessment
      • ED0010624 - Procurement Readiness Review (PRR)​
      • ED00XXXXX - Prevention Through Design Assessments
    • ED0008652 - Utility Plant Building
      • ED0006748 - Functional Requirements Specification (FRS)
      • ED0006749 - Technical Requirements Specification (TRS)
      • ED0011746 - Requirements and Specification Review (RSR)
      • ED0007699 - Interface Control Document (ICD)
      • ED0011773 - Risk Assessment
      • ED00XXXXX - Procurement Readiness Review (PRR)​​
      • ED00XXXXX - Prevention Through Design Assessments
    • ​ED0008653 - Linac Complex​
      • ​ED0008043 - Functional Requirements Specification (FRS)
      • ED0010906 - Technical Requirements Specification (TRS)
      • ED0011070 - Requirements and Specification Review (RSR)
      • ED0007700 - Interface Control Document (ICD)
      • ED0011767 - Risk Assessment
      • ED00XXXXX - Procurement Readiness Review (PRR)​​
      • ED00XXXXX - Prevention Through Design Assessments​
    • ED0008654 - Booster Connection
      • ​ED0006794 - Functional Requirements Specification (FRS)
      • ED0006795 - Technical Requirements Specification (TRS)
      • ED0011922 - Requirements and Specification Review (RSR)
      • ED0007702 - Interface Control Document (ICD)
      • ED0011774 - Risk Assessment
      • ED00XXXXX - Procurement Readiness Review (PRR)​​
      • ED00XXXXX - Prevention Through Design Assessments​

 

Basis of Estimates (BO​​​Es)​​​​

    • ​​​​​​​​​​​​​​PIP-II-doc-2079121.06.01 - Project Management and Coordination
    • ​​​​PIP-II-doc-2085121.06.02.02 - Site Preparation Detailed and F​inal Design​
    • ​PIP-II-doc-2088121.06.02.03 - Site Clearing Construction
    • PIP-II-doc-2091121.06.02.04 - Site Work Construction​
    • PIP-II-doc-2094121.06.02.05 -​ Site Restoration and Landscaping Construction
    • PIP-II-doc-2103121.06.03.02 - Cryogenics Plant Building Detailed and Final Design
    • PIP-II-doc-2106121.06.03.03 - Cryogenics Plant Building Construction
    • PIP-II-doc-2112121.06.04.02 - Utility Plant Detailed and Final Design
    • PIP-II-doc-2115121.06.04.03 - Utility Plant Construction​​​
    • PIP-II-doc-2121121.06.05.02 - Linac Complex Detailed and Final Design
    • PIP-II-doc-2124​121.06.05.03 - Linac Complex Construction
    • PIP-II-doc-2130121.06.06.02 - Booster Connection Detailed and Final Design​
    • PIP-II-doc-2133121.06.06.03 - Booster Connection Construction​​

 ​

Work Authorization Documents (WADs)​​​​

    • ​​​​​​​​​​​​​PIP-II-doc-3750:  121.06.01 - Project Management and Coordination
    • PIP-II-doc-3753121.06.02.01 - Site Preparation Project Management and Coordination
    • ​​​PIP-II-doc-3756121.06.02.02 - Site Preparation Detailed and F​inal Design​
    • PIP-II-doc-3759121.06.02.03 - Site Clearing Construction
    • PIP-II-doc-3768121.06.02.05 -​ Cyrogenics Plant Building Project Management and Coordination
    • PIP-II-doc-3771121.06.03.02 - Cryogenics Plant Building Detailed and Final Design
    • PIP-II-doc-3774121.06.03.03 - Cryogenics Plant Building Construction
    • PIP-II-doc-3777:  121.06.04.01 - Utility Plant Project Management and Coordination
    • PIP-II-doc-3780121.06.04.02 - Utility Plant Detailed and Final Design
    • PIP-II-doc-3783121.06.04.03 - Utility Plant Construction​​​
    • PIP-II-doc-3786:  121.06.05.01 - Linac Complex Project Management and Coordination  
    • PIP-II-doc-3789121.06.05.02 - Linac Complex Detailed and Final Design
    • PIP-II-doc-3792121.06.05.03 - Linac Complex Construction
    • PIP-II-doc-3795:  121.06.06.01 - Booster Connection Project Management and Coordination  


 Quality Assurance​​


 Other Documents​​


Meetings

  • ​PIP-II Linac Complex Design Review Meeting

  • ​PIP-II Linac Complex Electrical Coordination Meeting

  • PIP-II Linac Complex Mechanical Coordination Meeting​​
  • PIP-II Linac Complex Structural Coordination Meeting

3D Models​​​​


 

 
PIP-II Con​​ventional Facilities Project Photos & Webcams

 

Project Photos​​​​

​​

Project Webcams​​​​

    • Southeast


Construction Requests f​​or Info​rmation
System Design Reviews​​​Authorization for Use and Possession (AUP) Reports​
Technical Review Plan
Earned Value Management Systems (EVMS)​Final Acceptance Reports​
​​Construction Submittals
CAM Reports​​Shielding Information
​​
Turnaround Reports​
Project Photos

WBS Dictionary​
Project Webcams
​​​Wilson Hall
Southeast​​​

Architectural Advisory Board​​​Acceptance Test Reports​

Baseline Change Requests (BCRs)​Risk Register​

Engineering Calculations​Meeting Minutes​​​​​

Independent Cost Estimate (ICE)

Preliminary Design Reports (PDRs)

Independent Project Review (IPR)







​​

​​




​​





​​​