OQBP Assessment of 35-ton Cryostat Prototype

  
Edit
  
Description
collapse Document Type : Cryo-Safety Review Submittals & Approvals ‎(4)
 
  
Minutes of Meetings with Cryo Safety Panel
 
  
Overview of Construction Tasks
 
  
Concrete Work Authorization
 
  
Documents provided to Safety Panel
collapse Document Type : LAr 35Ton Engineering - IHI design and installation documents available upon request (confidential) ‎(13)
 
  
Membrane Cryostat - RFP Specification List
 
  
Membrane Cryostat  List of IHI Docs (Design & Installation)
 
  
Membrane Cryostat & Cryogenic System - Engineering Risk Assessment
 
  
JHA - Cryostat construction
 
  
Membrane Cryostat - Minutes of Meetings with IHI
 
  
Concrete for Cryostat - RFP Specs list, Design Calcs, & Drawings
 
  
Concrete for Cryostat - Quality Issues
 
  
Concrete for Cryostat - Procurement Communications
 
  
Concrete for Cryostat - Minutes of Contractor Weekly Meetings
 
  
Cryogenic System - Conceptual Design
 
  
Cryogenic System - LBNE-LAPD Coordination meetings
 
  
Cryogenic System - LBNE-LAPD Coordination Meetings
 
  
Cryogenic System - Roof Structure over PC4 Hatch
collapse Document Type : LAr 35Ton Project Management ‎(13)
 
  
Risk Assessment per Fermilab Engineering Manual
 
  
Scope - RFP/Spec for Membrane Cryostat
 
  
Scope - LAr-FD Conceptual Design Report for CD-1 Director's Review, March 2012
 
  
Dec 2011 Internal Review Presentation
 
  
March 2012 CD-1 Director's Review Presentation
 
  
Schedule & Cost - Basis of Estimate
 
  
Schedule & Cost - BOE Supporting Documents
 
  
Schedule & Cost - Discussion with PPD Management on manpower needed for 35ton prototype
 
  
35ton Protoype Weekly Reports 2011
 
  
35ton Prototype Weekly Reports 2012
 
  
35ton Cryostat RFP Evaluation Proposal Evaluation Process
 
  
Schedule - 35ton Schedule excerpted from overall LBNE P6 schedule
 
  
Cost - 35ton Prototype budget excerpted from Cobra report of LBNE total cost
1 - 30Next

 

  
  
  
  
12-QA-011_PPD_projects_Plan_Rev004.docx
  
6/11/2012 7:48 AMElaine G Mccluskey
35 ton - OQBP QA assessment Summer 2012.docx
  
10/4/2012 3:45 PMRussell A Rucinski

 

 

 

< November 2019 >
 Sun  Mon  Tue  Wed  Thu  Fri  Sat 
 27 
 28 
 29 
 30 
 31 
 1 
 2 
 3 
 4 
 5 
 6 
 7 
 8 
 9 
 10 
 11 
 12 
 13 
 14 
 15 
 16 
 17 
 18 
 19 
 20 
 21 
 22 
 23 
 24 
 25 
 26 
 27 
 28 
 29 
 30