Skip Ribbon Commands
Skip to main content

Skip Navigation LinksProposals and Design Reports

​​​​​​​Note: The set of volumes and annexes of the full Conceptual Design Report from 2015 can be found on the CD-1-R review website.


Document
  
collapse Project : LBNF/DUNE ‎(1)
CD-3a 10/15
collapse Project : LBNF ‎(5)
CD-3a 11/15
draft May 2019
CD-1-R
CD-3a 10/15
CD-3a 11/15
collapse Project : DUNE ‎(19)

​DUNE TDR Volume 1: Executive Summary​

coming July 2019

​DUNE TDR Volume 2: DUNE Physics​

coming July 2019

​DUNE TDR Volume 3: The Single-Phase Far Detector Module​

coming July 2019

​DUNE TDR Volume 4: The Dual-Phase Far Detector Module​

coming July 2019

​DUNE TDR Volume 5: Technical Coordination​

coming July 2019
orig 7/17
arXiv 12/15
arXiv 4/14
arXiv 1/16
CD-1-R
CD-1-R
CD-1-R
CD-1-R
CD-1-R
CD-1-R
CD-1-R
CD-1-R
CD-1-R
​​​​​​​


 

​​