Meeting to be held in Wilson Hall 2SW (Black Hole)


  
Content
  
collapse Date (Calculated) : 5/18/2017 ‎(6)
10:00

Central Utility Cavern Discussion Topics

  • CUC footprint clashes
  • Nitrogen dewar storage locations in CUC 
  • Number of Electrical Drops for welding and small tools and their locations
12:00

​Lunch (on your own)

13:00

Mezzanine Discussion Topics

What is fairly well determined: 

  • Mezzanine length & width
  • Mezzanine offset from cavern walls
  • Layout of cryo equipment on mezzanine. Note interferences with HVAC.
  • Location of monorails and suspended hoists. Note interferences with HVAC.
  • Grating on top of mezzanine should be removable; open or closed pattern to allow air flow?
  • Lifting eye locations, septum and mezzanine, with 10 metric ton capacity. Note inevitable clash with HVAC.
  • Spreader bar to be designed/provided by Cryostat
  • Clear definition of what’s needed for the cryostat to start construction – power, lights, HVAC, monorails, concrete slabs, etc.

What is assumed but could change:

  • Assumed location & spacing of hanging rods to support mezzanine. Is horizontal clearance adequate?
  • Layout of cryo piping under mezzanine
  • SP rack layout
  • Locations of cryo penetrations in cryostat top to which pipes are routed
  • Base assumption for rack cooling; where does CF provide chilled water?
  • Height above rock septum

What is to be determined:

  • Means of support for and means to access FD racks on a platform (by TBD) under mezzanine at top of intermediate cryostat crossbeam level
  • Depth of mezzanine structure (CERN to start design soon)
  • Code requirements? 
    • Clear space between bottom of deepest beam and top of cryostat steel frame, presently assumed at 7'-0". Clear zone includes no piping.
    • Location of, and responsibility for, fire suppression (sprinklers) and fire detection underneath mezzanine
  • Location of and responsibility for lighting under mezzanine
  • Number of Electrical Drops for welding and small tools and their locations
  • Bridge design between rock and cryostat – what does CF assume for connection and loading?
  • Discuss the Final Design kick-off meeting and get input on cryo and DUNE participation.  We currently assume David Montanari, Marzio, and Jim Stewart will present key interface info, but will do so remotely.
15:00

Break

15:30

​Discussions continue as needed

Detector Rack Cooling

17:00

​Adjourn


Remote Connection Information

 

Join from PC, Mac, Linux, iOS or Android: https://zoom.us/j/6308405407

Dial Toll Number: +1 646-558-8656 or +1 408-638-0968

International numbers are available: https://zoom.us/zoomconference?m=Ux4AV6A4t19OrB_nC23b2h3eIB5G9TnW

Enter the 10-digit Meeting ID,  630 840 5407 followed by "#"