collapse Date (CT) : 2/27/2017 ‎(7)

​Introductions

​LBNF and DUNE CAD Integration Goals

The goal of integrating separate CAD models and designs is to have latest versions of CAD models available to everyone in a common format useable to everyone so that

  -Clashes and interferences can found and resolved

  -Designs can be coordinated

  -Installation/construction sequences can be planned.

CAD integration as shown in the figure is aimed at coordination, not necessarily producing construction/installation drawings.


Elaine McCluskey

​Overview of Far Site CAD Integration Process

  • Today's Focus on FD=>Cryostat/Mezzanine/Prox Cryo=>Fermilab Integration and Model/View Outputs (Figure 1==>)
  • Team working on integration process

se process.PNG

Elaine McCluskey

​CAD Roles/Responsibilities for this Integration Segment

Jack Fowler

​What is Being Done Today

​Discussion of What is Needed to Accomplish the Integration (Notes on White Board)

  • CAD Formats & Translations
  • Transfer Process
  • Data Storage (including who retains record information through fab/construction/installation/operations)
  • Publication of Models (what format, where, how often)
  • Publication of Views (what format, where, how often)
  • How to Make Information Regularly Available and Keep Configuration Control (including where to display it for easy reference by many stakeholders)
  • Sharing of Drawings vs. Models

​Other Topics/Next Steps

Content
  
collapse Date (CT) : 3/02/2017 ‎(7)

​Introductions

​​LBNF and DUNE CAD Integration Goals

Elaine McCluskey

​Overview of the Far Site CAD Integration Process

Team working on integration process:

se process.PNG

  • Today's Focus on FSCF A/E=>Fermilab Integration + Other Cry Systems=>Fermilab Integration + Model/View Outputs (Figure 2==>)
Elaine McCluskey

​CAD Roles/Responsibilities for this Segment

David Montanari/Josh Willhite

​What Integration Processes Are Being Done Today

​Discussion of What is Needed to Accomplish the Integration (Notes on White Board)

  • Describe What Was Discussed on 27 February (Jack Fowler)
  • CAD Formats & Translations
  • Transfer Process
  • Data Storage (including who retains record information through fab/construction/installation/operations)
  • Publication of Models (what format, where, how often)
  • Publication of Views (what format, where, how often)
  • How to Make Information Regularly Available and Keep Configuration Control (including where to display it for easy reference by many stakeholders)
  • Sharing of Drawings vs. Models

​Other Topics/Next Steps

- 4850L grid layout

4850L LBNF Complex Grid-20170302.pdf


 


 


Remote Connection Information

 

Join from PC, Mac, Linux, iOS or Android: https://zoom.us/j/6308402193

Dial Toll Number: +1 646-558-8656 or +1 408-638-0968

International numbers are available: https://zoom.us/zoomconference?m=Ux4AV6A4t19OrB_nC23b2h3eIB5G9TnW

Enter the 10-digit Meeting ID, 630 840 2193 followed by "#"



Figures


 

FSCADFig1.jpg

Figure 1 (Full size Image)


 


 


 


 


 


 


 


 


 


 


 


 


 


 


 


 


 


 


 


 


 


 


 


 


 


 


 


 


 


 


 


 


 


 

 



 

FSCADFig2.jpg

Figure 2 (Full size Image)