​​Purpose:

The purpose of this group is to involve the DUNE Collaboration in the optimization of the focusing system of the LBNF beamline

  • serve as a contact point for hardware resources from the Collaboration interested in collaborating with the LBNF Project/Accelerator Division for the optimization of the focusing system
  • support the Beam Optimization Task Force by evaluating the engineering feasibility of the proposed solutions for the focusing system
  • evaluate suggested 1.2 MW target designs both for the NuMI baseline horns and for the optimized focusing system


​Convenor​:​​Chris Densham
​Deputy:Robert Zwaska
​Email list:
??
​Meeting Time:
??






Web Part Error: Sandboxed code execution request failed. Correlation ID: c421909e-ef52-705e-7a59-fd9affc76cc1.