Purpose:

The Grounding and Shielding Committee is responsible for:

1) Devising a plan for how detector and building grounds are implemented at the Far Detector; also understanding the AC distribution.

2) Specification of detector shielding with regards to cables and the handling of all powered equipment near the detectors.

3) Working with the subsystems and reviewing designs to ensure ​compliance with above at the Far detector.

4) Doing the same as items 1-3 for smaller scale prototypes, such as ProtoDUNE.


 

​Email list:
​dune-fd-grounding
Meetings:​​TBD
​Administration:


 

Members

​Name
​Area of work
​email
Terri Shaw (FNAL)

Linda Bagby (FNAL)

Steve Chappa (FNAL)

Marvin Johnson (Consultant)

Veljko Radeka (BNL)

Rick Van Berg (UPENN)

TBN​

TBN
​Committee Chair

Member

Member

Member

Member

Member

Memeber - To be Named

Memeber - To be Named
​​​tshaw@fnal.gov

bagby@fnal.gov

chappa@fnal.gov

johnsontechnicaldesign@gmail.com

radeka@bnl.gov
​​
rick@hep.upenn.edu

Documentation

Description
Dune Docdb
Dune Infrastructure Grounding

http://docs.dunescience.org:8080/cgi-bin/ShowDocument?docid=285

ProtoDUNE Infrastructure Groundinghttp://docs.dunescience.org:8080/cgi-bin/ShowDocument?docid=879
Initial ​ProtoDune APA G&S Reviewhttp://docs.dunescience.org:8080/cgi-bin/ShowDocument?docid=1330
Initial ​ProtoDUNE Photon Detector G&S Review